side study · Latvian public-procurement archive · 2026-08
Pre-registered backtest that killed its own product idea
I ingested 13 years of Latvian public-procurement awards (432,015 awards), ran a temporally strict backtest against kill criteria written in advance, and stopped the product when the idea failed them.
A 12-phase build spec proposed selling "companies likely to enter your category" leads. Before building anything, the question was whether a company's award history in adjacent CPV categories predicts entry into a new category any better than the CPV subscriptions suppliers already get for free.
Constraints
Kill criteria were fixed before looking at results.
Temporal strictness: an as_of cutoff is enforced in SQL with an assertion, plus a leakage test.
The data is notice-level only, so per-company bid counts and win rates cannot be built.
Two source channels with different date semantics: eForms JSON (2023+) and archive XML (2013-2025).
Market arithmetic done up front: a few hundred possible buyers at ~30-80 EUR/month.
What I built
public archive (procurement authority)
| downloader: 5,281 files, 1.5 GB
v
parsers eForms JSON (2023+) | archive XML (2013-2025)
| publication_date re-derived from source filenames <- after a leak was found
v
SQLite 432,015 awards, 28,136 winning companies
| as_of cutoff asserted in SQL + leakage test
v
+-------------------+------------------------+
| baselines | hypothesis |
| popularity floor | adjacent_cpv |
| parent_division | |
+-------------------+------------------------+
|
v sampled entry events
metrics Hit@5 / Hit@10 / Hit@20, MRR, median rank
v
paired bootstrap CIs -> go / no-go in FINDINGS
fig 1. The harness. The data layer and backtest harness are kept for reuse.
Replaced a 12-phase build plan with a one-week validation plan and pre-registered its criteria.
Found and fixed two date-leakage paths before trusting any number.
Added a missing effect-size criterion when a significant-but-useless lift came back, and wrote down that the criteria themselves needed repair.
Accepted the negative result and filed the project as dead.